单项选择题
In your project, you use product analysis to translating project objectives into tangible deliverables and requirements. All the following tools are used for product analysis EXCEPT ______ .
A.value engineering
B.value analysis
C.product breakdown
D.benefit/cost analysis
点击查看答案&解析
<上一题
目录
下一题>
热门
试题
单项选择题
Which of the following tool is used for scope verification
A.Performance measuremen
B.Scope change control syste
C.Inspectio
D.Earned valu
点击查看答案&解析
单项选择题
All of the following assist in determining the impact of a scope change EXCEPT______.
A.project charter
B.baseline
C.performance measurement
D.milestones
点击查看答案&解析