单项选择题

The subdivision of major project deliverables, as identified in the scope statement, into smaller, more manageable components is called ______ .

A) parametric estimation
B) create WBS
C) feasibility analysis
D) benefit-cost analysis
<上一题 目录 下一题>
热门 试题

单项选择题
The causes of variances and the reasoning behind the corrective action chosen are summarized the ______ .
A) work breakdown structure
B) accounting codes for the activities
C) lessons learned
D) performance reports
单项选择题
Your project involves manufacturing high precision engine subassemblies for the shipping industry. You have to perform several activities such as measuring, examining. and verifying to determine whether work and deliverables meet requirements and product acceptance criteria. You would have to do several reviews, product reviews, audits and walkthroughs. These activities are carried out in which process
A) Verify scope.
B) Quality inspection.
C) Scope planning.
D) None of the above.