判断题

To prevent the buyer from opening the L/C late,the exporter should stipulate at the same time in the contract:“The relevant L/C must reach the seller not later than one month before the date of the shipment”.( )

【参考答案】

正确

(↓↓↓ 点击‘点击查看答案’看答案解析 ↓↓↓)