问答题
sailing schedule
【参考答案】
船期表
点击查看答案&解析
<上一题
目录
下一题>
热门
试题
判断题
To prevent the buyer from opening the L C late,the exporter should stipulate at the same time in the contract:“The relevant L C must reach the seller not later than one month before the date of the shipment”.( )
点击查看答案&解析
判断题
Time of Shipment should be stipulated in a clear and flexible way in the contract.( )
点击查看答案&解析
相关试题
装运单据
载重线
最迟装运期
有效期
装运港