单项选择题
(75)Development is a structured design methodology that proceeds in a sequence from one phase to the next.
A.Waterfall
B.Phased
C.Prototyping
D.Parallel
点击查看答案&解析
<上一题
目录
下一题>
热门
试题
单项选择题
Which of the following is not part of a modem quality management concept(74)
A.Performance standard is zero defects
B.Quality must be inspected in
C.85% of failures occur because of the process, not the worker
D.Quality is a 4 cycle process plan/do/check/act
点击查看答案&解析
单项选择题
从监理的角度来分类,以下不属于监理总控类文档的是______。
A.监理合同
B.监理工作总结
C.监理实施细则
D.监理规划
点击查看答案&解析