单项选择题

We’ll not charge the sorting expense()your account.

A.at
B.to
C.for
D.in

<上一题 目录 下一题>
热门 试题

单项选择题
What is MTI?().

A.The fioot/tons needed to trim the vessel by 1 inch
B.The foot/tons needed to trim the vessel by 1 foot
C.The moments needed to trim the vessel by 1 centimeter
D.The amount of vessel will trim when loading 100 tons 100 feet from the tipping center

单项选择题
What is reserve buoyancy?().

A.The amount of buoyancy measured in foot/tons
B.The vertical distance above the waterline inside the hull
C.The volune of space that is filled with water
D.The volume of intact space above the waterline

相关试题
  • ()is halfway between the forward ...
  • A tide is called diurnal when().
  • Your vessel is docking, but not y...
  • What is a CORRECT reply to a pilo...
  • Shipboard Emergency Drills must be ...