单项选择题

On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().

A.winch speed
B.boom strength
C.load radius
D.cable strength

<上一题 目录 下一题>
热门 试题

单项选择题
Oil may NOT be transferred unless().

A.there are two certificated tankermen on each vessel
B.the vessel is equipped with constant-tension winches
C.discharge containment equipment (i.e. drip pans) are in place
D.All of the above

单项选择题
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().

A.Bareboat
B.Voyage
C.Time
D.Lease

相关试题
  • 在海上拖航过程中,不是拖船的原因在被拖船...
  • 关于海上拖航和海上雇佣救助,以下表述有误...
  • 根据我国海商法规定,在海上拖航条件下,承...
  • 根据我国海商法规定,承拖方与被拖方之间的...
  • 在海上拖航过程中,对于承拖方和被拖方所遭...