单项选择题
A.r(i,j)=tL(j)-[tL(i) +t(i,j)] B.r(i,j)=tL(j)-[tE(i) +t(i,j)] C.r(i,j)=tE(j)-[tL(i) +t(i,j)] D.r(i,j)=tE(j)-[tE(i) +t(i,j)]
A.R(1,2)=0,R(2,4)=0,R(4,6)=0 B.R(1,2)=0,R(3,5)=0,R(5,6)=0 C.R(1,2)=0,R(2,3)=0,R(3,5)=0,R(5,6)=0 D.R(1,2)=0,R(2,3)=0,R(3,4)=0,R(4,6)=0
A.工程的总工期不变,关键路线减少 B.工程的总工期不变,关键路线不变 C.工程的总工期缩短,关键路线减少 D.工程的总工期缩短,关键路线不变