单项选择题

Generally accepted methods for translating project objectives into tangible deliverables and requirements is also referred to as ______ .

A.product analysis
B.risk measurement
C.alternatives identification
D.benefit/cost analysis
<上一题 目录 下一题>
热门 试题

单项选择题
Scope planning for a project is ______ .
A.the project specification that includes design principles and project objectives
B.a three-level project work breakdown structure
C.the process of creating a project scope management plan
D.the record showing that all project deliverables are completed satisfactorily
单项选择题
Which of the following is an example of a constraint
A.A predefined budge
B.The threat of a strike by a subcontracto
C.Relationship with the selle
D.The method used to measure project performanc