单项选择题

A company operates a job costing system. Job number 1012 requires 30 of direct labour. Direct labour is paid at the rate of 12.50 per direct labour hour and non-production overheads are absorbed at a rate of 60% of prime cost.
What is the total cost of job number 1012?

A.$200
B.$170
C.$195
D.$240