单项选择题
To define variance thresholds at designated time points over the duration of a project, you will use ______ .
A) units of measure
B) precision level
C) organizational procedure links
D) control thresholds
点击查看答案&解析
<上一题
目录
下一题>
热门
试题
单项选择题
Earned value technique(EVT)can best be defined as ______ .
A) analysis of the value of the equipment that has been installed as of the date
B) analysis of the sum of the labor costs, which have been incurred on the project to date
C) a method of project performance measurement
D) a method of measuring the amount of money that has been spent to date
点击查看答案&解析
单项选择题
You are a project manager of a small construction project. Your project was budgeted for US $72,000 over a six week period. As of today, you’ve spent US $22,000 of your budget to complete work that you originality espected would cost US $24,000. According to your schedule, you should have spent US $30,000 by this point. Based on these circumstances, you project could be BEST described as ______ .
A) under budget
B) over budget
C) on budget
D) need more info
点击查看答案&解析