未分类题

?Read the article below about the shortage of talent in AsiA.
?Choose the best sentence from the opposite page to fill each of the gaps.
?For each gap 8-12, mark one letter (A-G).
?Do not use any letter more than oncE.
?There is one extra letter which you do not need to usE.
Asia's Skills Shortage
It seems odD.In the world's most populous region the biggest problem facing employers is a shortage of peoplE.
Asia has more than half the planet's inhabitants and is home to many of the world's fastest-growing economies. But some businesses are being forced to reconsider just how quickly they will be able to grow, because they cannot find enough people with the skills they neeD.
In a recent survey, 600 Chief executives of multinational companies with businesses across Asia were intervieweD.(8) It was their second-biggest headache in Japan (after cultural differences) and the fourth-biggest in India (after problems with infrastructure,bureaucracy and wage inflation) . Across almost every industry and sector it was the samE.
Old Asia-hands may find it easy to understand why there is such concern. The region's rapid economic growth has fished out the pool of available talent, they would say. (9) Recent growth in many parts of Asia has been so great that it has rapidly transformed the type of skills needed by businesses. Schools and universities have been unable to keep up.
This is especially true for professional stafF.Airlines are one examplE.Many new carriers are setting up and airlines are offering more services to meet demanD.(10) According to Alteon Training, the commercial-pilot training arm of Boeing, India has fewer than 3000 pilots today but will need more than 12000 by 2025. China will need to find an average of 2200 new pilots a year just to keep up with the growth in air travel,which means it will need more than 40000 pilots by 2025. In the meantime, with big international airlines training only a few hundred pilots a year, Asian airlines have taken to poaching them, often from each other.
(11) China has been trying to lure pilots from Brazil, among other places.
With such a mismatch between supply and demand in Asia's labour markets, companies will have to become better at hiring good staff and keeping them. The first priority is to realize that retention is more important than recruitment. But as some companies will always be better at this than others, the job-hopping and poaching are set to continue for many years, until education and training catch up. (12) Without talented recruiting policies, some firms may end up scaling back their bold Asian growth-plans.
A.However, there is also a failure of education.
B.Philippine Airlines, for instance, lost 75 pilots to overseas airlines during the past three years.
C.As it turned out, they ranked a shortage of qualified staff as their biggest concern in China and South-east AsiA.
D.There is also a severe shortage of good managers.
E.The consequences of that are depressing and will limit the growth.
F.But, in the meantime, there is a dreadful shortage of pilots.
G.Asia has more than half the planet's inhabitants and is home to many of the world's fastest-growing economies.
(8)

A.However,
B.Philippine
C.As
D.There
E.The
F.But,
G.Asia
H.
(8)

【参考答案】

C
C 解析:“调查表明,他们把合格员工短缺视为中国和东南亚国家的首要问题”。本题型要求充分利用上下文的线索(如......

(↓↓↓ 点击下方‘点击查看答案’看完整答案 ↓↓↓)
热门 试题

未分类题
某多层砖混住宅土方工程:1.土壤类别为三类土;基础为砖大放脚带形基础;垫层宽度为920mm;挖土深度为1.8m,弃土运距4km;挖土总长度1500m。2.投标人根据工程地质资料和施工图样确定施工方案。基础挖土工作面宽度各边为0.25m,放坡系数为0.2。基础挖土采用90%挖掘机械挖土,10%人工挖土。现场堆土2100m3,运距为60m,采用人工运输,其余土均用自卸汽车运走,运距4km。3.根据投标人的企业定额可知,人工挖土的工料单价为8.4元 m3;人工运土60m的工料单价为7.38元 m3,挖掘机挖土工料单价为1.2元 m3,自卸汽车运土4km工料单价为17元 m3。4.投标人认真决策决定该工程分摊的管理费、利润的费率值分别为工料直接费的10%和8%。5.该项工程措施费仅为机械进出场费,经计算其值为1400元。该项工程无其他项目费和零星工作项目费。该工程所在地区的规费标准为1%,税金标准为3.41%。[问题]1.计算该工程挖土的清单工程量。2.计算该工程分项清单综合单价。3.计算该工程的工程量清单报价。
A.土壤类别为三类土;基础为砖大放脚带形基础;垫层宽度为920mm;挖土深度为1.8m,弃土运距4km;挖土总长度1500m。
B.投标人根据工程地质资料和施工图样确定施工方案。基础挖土工作面宽度各边为0.25m,放坡系数为0.2。基础挖土采用90%挖掘机械挖土,10%人工挖土。现场堆土2100m3,运距为60m,采用人工运输,其余土均用自卸汽车运走,运距4km。
C.根据投标人的企业定额可知,人工挖土的工料单价为8.4元/m3;人工运土60m的工料单价为7.38元/m3,挖掘机挖土工料单价为1.2元/m3,自卸汽车运土4km工料单价为17元/m3。
D.投标人认真决策决定该工程分摊的管理费、利润的费率值分别为工料直接费的10%和8%。
E.该项工程措施费仅为机械进出场费,经计算其值为1400元。该项工程无其他项目费和零星工作项目费。
F.41%。
G.计算该工程挖土的清单工程量。
2.计算该工程分项清单综合单价。
3.计算该工程的工程量清单报价。