单项选择题

When the vessel arrives, the cargo of machinery to be unloaded is().

A.transpored to the ships side
B.transported into the shed
C.lashed and secured
D.delivered to the consignor

<上一题 目录 下一题>
热门 试题

单项选择题
When working with lumber, wire and staples are not desirable to be used because().

A.they are not subjected to cause trouble
B.they are difficult to handle this kind of cargo
C.the efficiency of separating is raised
D.the efficiency of loading is greater

单项选择题
Which is the summer load waterline on the load waterline mark?().

A.The first line at the bottom
B.The second line from the bottom
C.The third line from the bottom
D.The fourth line from the bottom

相关试题
  • ()is halfway between the forward ...
  • A tide is called diurnal when().
  • Your vessel is docking, but not y...
  • What is a CORRECT reply to a pilo...
  • Shipboard Emergency Drills must be ...