单项选择题

Most pedestal crane power is provided by().

A.Electro-hydraulic units
B.Steam units
C.Independent internal combustion power units
D.All of the above

<上一题 目录 下一题>
热门 试题

单项选择题
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().

A.when the line pull reaches the rated winch capacity
B.after the line pull exceeds the rated winch capacity
C.after a short build-up of torque
D.immediately

单项选择题
How should you signal the crane operator to move slowly().

A.Use one hand to give any motion signal,and place the other hand motionless in front of the hand giving the motion signa
B.Extend arm with the thumb pointing up,and flex the fingers in and out for as long as the load movement is desired
C.First tap your elbow with one hand and then proceed to use regular signals
D.First tap the top of your head with your fist and then proceed to use regular signals

相关试题
  • Which statement is TRUE concerning ...
  • Which statement is FALSE concerning...
  • Which statement comparing a shipboar...
  • Which part provides for transverse ...
  • Which part of a conventional cargo...