单项选择题

案例分析题

A scientific discovery is often made 【C1】______before someone is able to put it to use.【C2】______,scientists discovered how to split atoms decades 【C3】______the invention of the atomic bomb and the use of 【C4】______power to produce electricity.But sometimes discovery and 【C5】______happen at the same time,as occurred more than thirty years ago 【C6】______the discovery of coherent light and the invention of the laser.
The word laser 【C7】______’light amplification by stimulated emission of radiation.’To many people,lasers are very mysterious,but a laser is simply a 【C8】______that produces a strong light.The light from the laser is called 【C9】______light because it is light that only moves in one direction.【C10】______,incoherent light,like the light from the sun or light from a bulb,moves away from its source 【C11】______all directions,so its strength is very spread out.The light from a laser,moving in only one direction and 【C12】______in a narrow beam,is much stronger.Laser light is created by a 【C13】______called stimulated emission.In this process,the atoms of a certain substance,such as a crystal or a gas,are excited 【C14】______that they produce coherent light.A person working with a laser can aim this coherent light,【C15】______a laser beam,in any direction.
As soon as the laser was developed,scientists began thinking of practical applications 【C16】______it.One of the earliest uses was to make extremely precise measurements of distance and speed.【C17】______,the distance to the moon was measured to within a foot,and the speed of light was measured to 【C18】______a thousandth of a mile per second.As time 【C19】______,many more applications for the laser were 【C20】______.

【C1】()

A.long
B.early
C.very
D.earlier

热门 试题

未分类题
某单位工程为单层钢筋混凝土排架结构,共有60根柱子,32m空腹屋架,监理工程师批准的网络计划如图1所示(图中工作持续时间以月为单位)。 该工程施工合同工期为18个月,质量标准要求为优良。施工合同中规定,土方工程单价为16元 m3,土方估算工程量为22 000m3,混凝土工程单价为320元 m3,混凝土估算工程量为1 800m3。当土方工程和混凝土工程工程量任何一项增加超出该项原估算工程量的15%时,该项超出部分结算单价可进行调整,调整系数为0.9。 在施工过程中监理工程师发现刚拆模的钢筋混凝土柱子存在工程质量问题。在发现有质量问题的10根柱子中,有6根蜂窝、露筋较严重;有4根柱子蜂窝、麻面轻微,且截面尺寸小于设计要求。截面尺寸小于设计要求的4根柱子经设计单位验算,可以满足结构案例和使用功能要求,可不加固补强。在监理工程师组织的质量事故分析处理会议上,承包方提出了如下几个处理方案。 方案一:6根柱子加固补强,补强后不改变外形尺寸,不造成永久性缺陷;4根柱子不加固补强。 方案二;10根柱子全部砸掉重做。 方案三:6根柱子砸掉重做,4根柱子不加固补强。 在工程按计划进度进行到第4个月时,业主、监理工程师与承包方协商同意增加一项工作K,其持续时间为2个月,该工作安排在C工作结束以后开始(K是C的紧后工作),E工作开始前结束(K是E的紧前工作)。由于K工作的增加,增加了土方工程量3 500m3,增加了混凝土工程量200m3。 工程竣工后,承包方组织了该单位工程的预验收,在组织正式竣工验收前,业主已提前使用该工程。业主使用中发现房屋面漏水,要求承包方修理。 【问题】 1.承包方要保证主体结构分部工程质量等级达到优良标准.以上对柱子工程质量问题的三种处理方案中。哪种处理方案能满足要求?为什么? 2.由于增加了K工作,承包方提出了顺延工期2个月的妻求,该要求是否合理?监理工程师应该签证批准的顺延工期应是多少? 3.由于增加了K工作,相应的工程量有所增加,承包方提出对增加工程量的结算费用为 土方工程3 500×16元=56 000元 混凝土工程200×320元=64 000元 合计120 000元 你认为该费用是否合理?监理工程师对这笔费用应签证多少? 4.在工程未正式验收前,业主提前使用是否可认为该单位工程验收?对出现的质量问题。承包方是否承担保修责任?