填空题

案例分析题

Scientists in California and Virginia will try to decode
genetic makeup of two plant-destroying microbes,including 【M1】______
one blaming for killing tens of thousands of oak trees along the 【M2】______
West Coast.
Backed by $4million in federal grants,the scientists hope
to sequence the genomes of the two species of Phytophthora.
The most notorious of the pair is P.ramorum,that causes sudden【M3】______
oak death syndrome.
With the genomes in hand,scientists expect to develop
the mean to track,detect and,eventually,treat both diseases.【M4】______
P.ramorum has killed tens of thousands of black oak,
coast live oak and tan oak trees in northern California and
southern Oregon as it first appeared in 1995.This year,【M5】______
scientists invented coast redwoods and Douglas fir also 【M6】______
are susceptible,as is at least 14other plant species.【M7】______
At the same time,scientists at the Walnut Creek laboratory
and at the Virginia Bioinformatics Institute in Blacksburg will
sequence the genome of P.sojae,a related microbe
responsible soy rot,which is estimated to cause $1billion in 【M8】______
damages to soy Bean crops worldwide.Both sequences will be
free available on the Internet once completed.【M9】______
The two species of funguslike organisms are closely
related to algae.Among their relatives is P.infestans,the microbe
responsible for the failure of potato crops in Ireland in the
19th century and the resulting famine.The name
Phytophthora means ’plant devourer’in Greece.【M10】______

【M1】()

【参考答案】

∧ genetic—the
热门 试题

未分类题
本题为案例分析题,要求分析合理,结论正确;有计算要求的,应简要写出计算过程。1. 对某实施监理的工程项目,业主依法进行了公开招标,并委托某监理公司代为招标。在该工程招标过程中,相继发生了下述事件。 事件1:招标公告发布后,有10家单位参加了资格预审报名。监理人员经过对这10家单位进行资格审查,确定A、B、C、D、E、F共6家单位为投标人。但业主认为B公司拟采用的锅炉本体不是由本地企业生产的,指示监理人员不得向B公司发售招标文件。 事件2:在现场踏勘中,C公司的技术人员对现场进行了补充勘察,并当场向监理人员指出招标文件中地质资料有误。监理人员则口头答复:“如果招标文件中的地质资料确属错误,可按照贵公司勘察数据编制投标文件。” 事件3:投标人D在编制投标书时,认为招标文件要求的合同工期过于苛刻,如按此报价,导致报价过高,于是按照其认为较为合理的工期进行了编标报价,并于截标日期前2天将投标书报送招标人。日后,D公司又提交一份降价补充文件。但招标人的工作人员以“一标一投”为由,拒绝接受该减价补充文件。 事件4:开标时,由于交通堵塞,有关领导不能准时到会。招标人临时决定将开标会议推迟至提交投标书截止时间后1小时举行,开标会议由市发改委主任亲自主持。 该工程项目合同工期为18个月,承包方编制的调试进度计划如图6-1所示,各项工作匀速进行。问题在事件1中,业主的做法是否妥当?为什么?