问答题

简答题 论计算机网络系统设计中接入技术的选择计算机网络技术的发展非常迅速,新技术不断涌现。在网络设计和实现中,各种接入方式和接入技术不断成熟,要求网络在规划和设计中,考虑实际情况,针对具体目标,选择适合的接入方式和技术。
请围绕“计算机网络系统设计中接入技术的选择”论题,依次对以下三个方面进行
论述.
1、简要叙述你参与设计和实施的计算机网络项目,以及你所担任的主要工作和接入方式的选择。
2、详细论述你在网络规划和设计中接入技术选择的思路与策略,以及所采用的技术和方法。
3、分析和评估你所采用的接入技术的措施及其效果,以及相关的改进措施。

【参考答案】

写作要点
1、叙述你参与设计和实施的计算机网络项目,该项目应有一定的规模,你在该项目中担任的主要工作应有一定的份......

(↓↓↓ 点击下方‘点击查看答案’看完整答案 ↓↓↓)
热门 试题

未分类题
● Information systems design is defined as those tasks that focus on the specification of a detailed computer-based solution. Typically, there are four systems design tasks for in-house development. 1) The first task is to specify (71) , which defines the technologies to be used by one, more, or all information systems in terms of their data, processes, interfaces, and network components. This task is accomplished by analyzing the data models and process models that are initially created during requirements analysis.2) The next systems design task is to develop the (72) . The purpose of this task is to prepare technical design specifications for a database that will be adaptable to future requirements and expansion.3) Once the database prototype has been built, the systems designer can work closely with system users to develop input, output and dialogue specifications. The (73) must be specified to ensure that the outputs are not lost, misrouted, misused, or incomplete. 4) The fourth design task involves packaging all the specifications from the previous design tasks into a set of specifications that will guide the (74) activities during the following phases of the systems development methodology.Finally, we should (75) and update the project plan accordingly. The key deliverable should include a detailed plan for the construction phase that should follow.(71)A. an application architectureB. a distributed system C. a system scopeD. a system physical model (72)A. database design specifications B. database organization decisionsC. data structure specifications D. data distribution decisions(73)A. format and layoutB. transaction details C. additional instructions D. internal controls(74)A. system administrator’sB. system analyst’s C. computer programmer’sD. system designer’s (75)A. adjust the project scheduleB. reevaluate project feasibilityC. evaluate vendor proposals D. select the best vendor proposal